SET-UP AND INSTALLATION TMS9000-2 OPERATOR MANUAL
6-62
Published 02-21-2019, Control # 611-05
4. Secure the pin (2) using the retaining clip.
Positioning/Removing the Hoist Cable
Positioning Hoist Cable
1. Remove the retaining sheaves (1) (Figure 6-123).
2. Guide the rope over the deflection sheaves (4), (3) and
over the nose sheave (2) of the extension.
3. Reinstall all the retaining sheaves (1) and secure with
retaining clips.
4. Install the hook tackle or the hookblock. The rope may
now be reeved for one or two parts of line, depending on
the length of the section.
Removing Hoist Cable
1. Unreeve the hookblock.
2. Remove the retaining sheaves (1) (Figure 6-123).
3. Take the wire rope off the head sheave (2) and
deflection sheaves (4), (3) and place it on the ground on
the left side.
4. Replace all retaining sheaves and secure them with
retaining clips.
CAUTION
Falling Objects Hazard!
Always make sure sheaves and pins that secure the hoist
cable are secured with clips. This prevents components
from coming loose, falling and causing injury.
FIGURE 6-123
10.5m (35ft) Swingaway Lattice
17.7 m (58 ft) Swingaway
1
1
1
1
1
1
2
3
2
1
3
4
4
3