SET-UP AND INSTALLATION TMS9000-2 OPERATOR MANUAL
6-60
Published 02-21-2019, Control # 611-05
1. Loosen the hinged pins (5) (Figure 6-118) and fold up
the guide sheaves (4).
2. Detach the strain relief from the holder (3) and attach it
to the holder (2).
3. Fold down the guide sheaves (4) and secure them with
the hinged pins (5).
Establishing the Hydraulic Connection
1. If necessary, bring the connections (1) (Figure 6-119)
into the position for boom extension operations.
2. Remove the hose line (2) from the clamp (4).
3. Feed the hose lines towards the left hand side through
the lower opening (3) in the 35 ft (10.5 m) section under
the boom head.
4. Remove the protective caps to the connections (1) and
attach the hose lines (observe color code).
FIGURE 6-118
7567-36
1
2
5
3
4
4
CAUTION!
Machine Damage!
Feed the hydraulic hoses under the main boom head in
such a way that they hang freely. Take care that the hoses
are not torn off when folding the lattice extension. This
prevents damage to the hydraulic hoses.