3-6 System Installation
3.2.3 Checking
1. After unpacking, check the objects in the container with the package list to see if anything is in
short supply or is wrong.
2. Inspect and make sure there is no damage to the machine, no indentation, no cracks.
When install the machine, the customer Service engineer should check rising and
lowering of machine. If the function is abnormal, follow the operations as shown in
7.5.
3.3 Installation of Main Unit
To prevent the machine from damage, when you perform the following operations,
please lock the casters if the machine doesn’t to be moved
3.3.1 Open up the Monitor
Adjust the monitor to the position as shown in the figure below.
Take care of your hands when adjust the monitor up and down.
3.3.2 Connecting the Power Cord
1. Push the retaining clamp upward, and insert the power plug into the receptacle, as shown in the
figure (a) below.