EasyManuals Logo
Home>Wacker Neuson>Excavators>28Z3

Wacker Neuson 28Z3 Service Manual

Wacker Neuson 28Z3
264 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #240 background imageLoading...
Page #240 background image
8-10 SHB 28Z3 EN – Edition 2.0 * 28z3s810.fm
PowerTilt PTS06
8.7 Removing the standard journal coupling
☞ Remove all 4 connecting plugs c (on left and right) from the housing and drain the oil
into a container.
☞ When the oil has been drained, fit the connecting plug back on again.
Notice!
Check the oil for signs of contamination (water) and metal particles.
☞ Slacken the 4 fastening screws of shaft a and remove them with plate washer b from
standard journal coupling 6 or from the drive-side 6.1 and end-cap side 6.2 base block.
Caution!
In order to avoid personal injury and damage to the equipment:
☞ Before removing the screws from securing ring d, secure the standard
journal coupling with lifting gear or similar equipment.
☞ Remove screws d of securing ring 5.
☞ Tighten both set screws e on securing ring 5. Turn the screws alternately to remove the
securing ring from end cap 4 and base block 6.2 on the end-cap side.
Fig. 4: Removing the connecting plug
1
c
Torque specifications for the connecting plug
Plug size Torque values Nm (lbs/ft)
BSPP G1/4 31 +/- 1 (22.9 +/- 0.7)
Fig. 5: Removing the fastening screws from the shaft
a
b
Fig. 6: Securing the coupling
Fig. 7: Securing the coupling
5
d
Fig. 8: Tightening the set screws
e

Table of Contents

Other manuals for Wacker Neuson 28Z3

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson 28Z3 and is the answer not in the manual?

Wacker Neuson 28Z3 Specifications

General IconGeneral
BrandWacker Neuson
Model28Z3
CategoryExcavators
LanguageEnglish

Related product manuals