Introduction
Chapter 1
11
1SFC132003M0201
Chapter 1 Introduction
1:1 About the complete set of
documentation for a softstarter
For the softstarter, the following documents are available:
PST30...PSTB1050 Softstarters
Installation and Commissioning Manual
Document ID: 1SFC132003M0201
1SFC132003M2001 (Chinese)
1SFC132003M3101 (Dutch)
1SFC132003M1801 (Finnish)
1SFC132003M0301 (French)
1SFC132003M0101 (German)
1SFC132003M0901 (Italian)
1SFC132003M4001 (Polish)
1SFC132003M1601 (Portuguese)
1SFC132003M1101 (Russian)
1SFC132003M0701 (Spanish)
1SFC132003M3401 (Swedish)
1SFC132034M6501 (Thai)
1SFC132003M1901 (Turkish)
1SFC132003M2201 (US version)
Catalog Softstarters
Document ID: 1SFC132004C0201
For other documents related to the PST Softstarters, see
home page www.abb.com/lowvoltage
1:2 About the installation and
commissioning manual
This manual contains instructions on how to install and
commission the softstarter. The manual covers procedures
for mechanical and electrical installation, and installation of
communication devices. It also covers energizing, setting,
and configuration and verifying settings.
For quickest possible start read Chapter 2 “Quickstart” .
1:2.1 Intended audiences
1:2.1.1 General
The installation and commissioning manual is intended for
the installation, commissioning, and maintenance personnel
responsible for putting the softstarter into normal service and
out of service.