EasyManua.ls Logo

ABB PST72 Installation And Commissioning Manual

ABB PST72
200 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #141 background imageLoading...
Page #141 background image
Functions
Chapter 10
141
1SFC132003M0201
10:19 Overload protection, dual type,
start class
Path in menu:
Menu/SETTINGS/Functional Settings/
Protections/Overload/Dual Class S
This parameter makes it possible to set the required class of
the overload protection during start. When full voltage is
reached there will be a switch-over to run class after 30
seconds. (see below).
10:20 Overload protection, dual type, run
class
Path in menu:
Menu/SETTINGS/Functional Settings/
Protections/Overload/Dual Class R
This parameter makes it possible to set the required class of
the overload protection for continuous run. The run class is
activated 30 seconds after full voltage has been reached.
Parameter
text
Default value Setting range Description
OL Class S 10 10A, 10, 20, 30 Overload class,
Dual type, Start
Class
Parameter
text
Default value Setting range Description
OL Class R 10 10A, 10, 20, 30 Overload class,
Dual type, Run
Class

Table of Contents

Other manuals for ABB PST72

Question and Answer IconNeed help?

Do you have a question about the ABB PST72 and is the answer not in the manual?

ABB PST72 Specifications

General IconGeneral
BrandABB
ModelPST72
CategoryController
LanguageEnglish

Related product manuals