D9412GV4/D7412GV4 v2.03 | Installation and System Reference Guide | Contents
.
Bosch Security Systems, Inc. | 7/16 | F01U265457-09 3
Contents
Federal Communications Commission (FCC)
Rules ........................................................ 2
1.0 Introduction ............................................. 7
1.1 About documentation .............................. 7
2.0 Lightning Strikes .................................... 10
2.1 Effects.................................................... 10
2.2 Precautions during Installation .............. 10
3.0 Overview ................................................ 11
3.1 Configuration and Parts ......................... 11
3.1.1 Parts List ............................................... 12
3.1.2 Parts Available by Separate Order ......... 12
3.2 Accessories ............................................ 13
3.3 Features in the GV4 Series Control Panels
............................................................... 16
3.3.1 SDI Interconnect Wiring ........................ 16
3.3.2 Tip and Ring Posts ................................. 16
3.3.3 Telephone Line Sniff .............................. 16
3.3.4 Points .................................................... 16
3.3.5 Areas and Accounts ............................... 16
3.3.6 Digital Communicator ............................ 17
3.3.7 Keypads ................................................. 17
3.3.8 Keyswitch .............................................. 18
3.3.9 Access Control ....................................... 18
3.3.10 Event Memory ........................................ 18
3.3.11 Event Log ............................................... 18
3.3.12 Ground Fault Detection ......................... 18
3.3.13 Ground Fault Detection Added Feature 19
3.3.14 Conettix Functions ................................ 19
3.3.15 Programming ......................................... 19
3.3.16 Dual Authentication ............................... 19
3.3.17 Other Features ...................................... 19
4.0 Installation ............................................. 20
4.1 Installation Preparation ......................... 20
4.2 Enclosure Options ................................. 20
4.3 Mounting Enclosure ............................... 20
4.4 Installing the Control Panel ................... 21
4.5 Connecting Earth Ground ...................... 21
4.5.1 Terminal 10 ............................................ 21
4.5.2 Ground Fault Detect Enable .................. 21
4.5.3 Enabling Ground Fault Detection .......... 21
4.5.4 Ground Fault Specifications .................. 21
4.5.5 Locking the Reset Pin ............................ 22
4.6 Completing the Installation ................... 22
4.6.1 Charging the Battery .............................. 22
4.6.2 Installing and Wiring Detection Devices 23
4.6.3 Installing Modules and Outputs ............ 23
4.6.4 Connecting the On-board Points and
Keypads ................................................. 23
4.6.5 Powering Up .......................................... 23
4.7 Updating Control Panel Firmware ......... 23
4.8 Programming the Control Panel ............ 23
4.9 Installing the Point Chart Label ............. 23
4.10 Testing the System ................................ 23
4.11 Service Walk Test .................................. 24
5.0 Power Supply ........................................ 28
5.1 Primary Power Terminals 1 and 2 ......... 28
5.1.1 Primary (AC) Power Circuit ................... 28
5.1.2 Installing the Transformer ..................... 28
5.2 Secondary Power Terminals .................. 28
5.2.1 Secondary (DC) Power .......................... 28
5.2.2 Installing the Battery ............................. 29
5.2.3 Replacing the Battery ............................ 30
5.2.4 Battery Supervision ............................... 31
5.2.5 Battery Charging Circuit Float Charge .. 31
5.2.6 Battery Discharge and Recharge Schedule
.............................................................. 32
6.0 Power Outputs ...................................... 34
6.1 Circuit Protection .................................. 34
6.2 Total Available Power ............................ 34
6.3 Continuous Power Outputs ................... 34
6.4 Programmable Power Outputs .............. 35
6.4.1 Programming ......................................... 35
6.4.2 Terminals 6 and 7 .................................. 35
6.4.3 Fire System Power Formula .................. 35
6.4.4 Terminal 8.............................................. 35
7.0 Telephone Connections ......................... 37
7.1 Registration ........................................... 37
7.2 Notification ............................................ 37
7.3 Location................................................. 37
7.4 Telephone Cord Connection ................. 37
7.5 Phone LED (Red) ................................... 38
7.6 Operation Monitor LED (Green) ............ 38
7.7 Dialing Format ....................................... 38
7.8 Telephone Line Monitor ........................ 38
7.9 Called Party Disconnect ........................ 39
7.10 Communication Failure ......................... 39
7.11 D928 Dual Phone Line Switcher............ 39
7.11.1 Description ............................................ 39
7.11.2 Operation .............................................. 39
7.11.3 Installing the D928 ................................ 41
7.11.4 D928 Status LEDs ................................. 41
8.0 On-Board Points .................................... 42