CHAPTER 6
Preparation Overview
•
Site Preparation Checklist for EX4200 Switches on page 61
•
Environmental Requirements and Specifications for EX Series Switches on page 62
•
General Site Guidelines on page 66
•
Site Electrical Wiring Guidelines on page 67
•
Rack Requirements on page 68
•
Cabinet Requirements on page 68
•
Requirements for Mounting an EX4200 Switch on a Desktop or Wall on page 69
•
Clearance Requirements for Airflow and Hardware Maintenance for EX4200
Switches on page 70
Site Preparation Checklist for EX4200 Switches
The checklist in Table 31 on page 61 summarizes the tasks you need to perform when
preparing a site for EX4200 switch installation.
Table 31: Site Preparation Checklist
DatePerformed byFor More InformationItem or Task
Environment
“Environmental Requirements and
Specifications for EX Series Switches”
on page 62
Verify that environmental factors such as
temperature and humidity do not exceed switch
tolerances.
Power
Measure distance between external power
sources and switch installation site.
Locate sites for connection of system
grounding.
“Power Specifications for EX4200
Switches” on page 73
Calculate the power consumption and
requirements.
Hardware Configuration
61Copyright © 2017, Juniper Networks, Inc.