Table 26: SRX110 Services Gateway Preinstallation Checklist for
Rack-Mount Installation (continued)
Additional InformationTask
“Clearance Requirements for Airflow and
Hardware Maintenance of the SRX110
Services Gateway” on page 42
Place the rack or cabinet in its permanent location,
allowing adequate clearance for airflow and
maintenance, and secure it to the building structure.
“Unpacking the SRX110 Services Gateway”
on page 49
Remove the services gateway chassis from the
shipping carton.
Verify that you have the following parts available
in your rack-mounting kit for the SRX110 Services
Gateway:
•
Rack-mounting brackets
•
Mounting screws
•
Power supply adapter tray with screws
•
Adapter stopper bracket
“Adjusting the Power Supply Adapter Tray
for the SRX110 Services Gateway for
Rack-Mount Installation” on page 58
Adjust the power supply adapter tray.
NOTE: The rack-mounting kit is not shipped with the device and must be
ordered separately.
Preparing the SRX110 Services Gateway for Desk-Mount Installation
You can mount the services gateway on a desk or other level surface horizontally or
vertically. The four rubber feet attached to the chassis provide stability.
Table 27 on page 54 provides the list of tasks you need to perform before installing the
device.
Table 27: SRX110 Services Gateway Preinstallation Checklist for
Desk-Mount Installation
Additional InformationTask
“Site Preparation Checklist for the SRX110
Services Gateway” on page 37
Verify that the site meets the requirements.
“Clearance Requirements for Airflow and
Hardware Maintenance of the SRX110
Services Gateway” on page 42
Place the desk in its permanent location, allowing
adequate clearance for airflow and maintenance,
and secure it to the building structure.
“Unpacking the SRX110 Services Gateway”
on page 49
Remove the services gateway chassis from the
shipping carton.
Copyright © 2013, Juniper Networks, Inc.54
SRX110 Services Gateway Hardware Guide