EasyManuals Logo

KYMCO XCITING 500 Service Manual

KYMCO XCITING 500
349 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #120 background imageLoading...
Page #120 background image
6. COOLING SYSTEM
6-10
XCITING 500
INSTALLATION
Install the thermostat into the housing with
its air bleed hole facing up and aligning
bleed hole with the tab in the housing.
Install a new O-ring into the housing cover
groove.
Install the housing cover and housing stay
to the housing.
Tighten the bolts securely.
Install the housing stay to the frame.
Tighten the nut securely.
Fill the system with recommended coolant
and bleed the air (page 6-6).
WATER PUMP
MECHANICAL SEAL INSPECTION
Inspect the telltale hole for sign of coolant
leakage.
If there is leakage, the mechanical seal is
defective, and water pump should be
replaced
Air Bleed Hole
Tab Align
O-ring
Telltale Hole

Table of Contents

Other manuals for KYMCO XCITING 500

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the KYMCO XCITING 500 and is the answer not in the manual?

KYMCO XCITING 500 Specifications

General IconGeneral
Displacement499 cc
Cooling SystemLiquid-cooled
TransmissionCVT
Front SuspensionTelescopic fork
Rear SuspensionDual shocks
Front BrakeDual disc
Rear BrakeSingle disc
Seat Height800 mm
Tire (Front)120/70-15
Tire (Rear)150/70-14
Engine Type4-stroke, single-cylinder
Fuel SystemElectronic Fuel Injection
Fuel Capacity12.8 L
Length x Width x Height2250 x 800 x 1450 mm

Related product manuals