4.24
ELECTRONIC FUEL INJECTION
9924096 - 2013 RANGER RZR XP 900 / RZR XP 4 900 Service Manual
© Copyright 2012 Polaris Sales Inc.
6. Remove the (2) IAC valve hoses (G) that are attached
to the throttle body.
7. Disconnect the wire harness from the MAQS located
on the end of the throttle body assembly.
8. Loosen the (2) hose clamps that retain the dual
throttle body assembly to the intake adapters.
Carefully lift the throttle body assembly out of the
intake adapters.
9. Lift the fuel rail and injectors out of the throttle body
assembly taking care not to damage the fuel injector
ends.
NOTE: It is not necessary to disconnect fuel lines or
the injector harnesses to perform this procedure.
10. Using a T20 Torx driver, remove the (4) screws
retaining the throttle body cover plate. Remove the
cover plate.
11. Rotate the throttle plate arm and remove the throttle
cable end (H) to allow for throttle cable removal.
12. Slide back the cable adjuster boot (I). Using a 14 mm
wrench, loosen the jam nut (J). Using a 12 mm
wrench, turn the adjuster (K) in and count the number
of turns it take to fully seat it. Note the number of turns
so it can be set the same upon assembly.
Loosen
Clamps
Throttle Body
Assembly