Punch Unit (B702)
SM 1-23 G179
Installation
1.7.2 INSTALLATION PROCEDURE
Unplug the main machine power cord before starting the following procedure. If
the 3000-sheet finisher has been installed, disconnect it and pull it away from the
machine.
1. If the finisher is connected to the machine, disconnect the power connector [1] and
move the finisher away from the machine.
2. Remove the rear cover [2] ( x 2) and open the front door.
At the bottom of the rear cover, make sure to disconnect the tabs that attach
the cover to the frame.
3. Remove the guide plate [3] ( x 2).