Overview of Trial Operation Procedure
Perform trial operation according to the following flowchart.
* This setting is required when using a 400 V Class Inverter for 55 kW or higher.
Fig 4.1 Trial Operation Flowchart
Installation and Mounting
Wiring and Connections
Power ON
Checking the Display Status
Setting the Power Supply Voltage Jumper*
No-load Operation
Application Settings
(Using Advanced Programming Mode)
Optimum Adjustment and Independent User
Constant Settings
Loaded Operation
Check and Recording User
Constants
Setting the Control Method
Basic Settings
Settings for the Control Methods
START
END
Refer to page 4-3.
Refer to page 4-3.
Refer to page 4-4.
Refer to page 4-6.
Refer to page 4-7.
Refer to page 4-27.
Refer to page 4-27.
Refer to page 4-27.
Refer to page 4-28.
Refer to page 4-4.
TOE-S616-60.1.book 2 ページ 2017年8月4日 金曜日 午後3時41分