Installing the 1U cable tray............................................................133
Connecting cables to the shelf..................................................... 137
DS60 rail replacement............................................................................... 137
Working with the portable lift....................................................... 137
Reconfiguring the lift with Voyager kit......................................... 138
Adjusting the arms for a frontal lift...............................................138
Removing a power supply unit......................................................139
Removing an LCC.........................................................................140
Opening the console..................................................................... 141
Removing the front bezel..............................................................141
Removing a disk drive...................................................................142
Removing a fan module................................................................ 143
Removing a shelf from the cabinet............................................... 144
Removing the universal rails..........................................................151
Installing rails............................................................................... 152
Installing the shelf onto the rails...................................................155
Inserting and securing the top cover and chassis......................... 159
Replacing a power supply............................................................. 163
Replacing an LCC......................................................................... 163
Installing a disk............................................................................. 164
Installing a fan.............................................................................. 165
Connecting cables to the shelf..................................................... 166
Verify the chassis replacement.....................................................167
Installing the front bezel...............................................................167
DS60 cable management assembly (CMA) rail replacement..................... 167
1U cable tray removal................................................................... 167
1U cable management tray installation (underneath)....................170
Adding Disks 177
Verify system health..................................................................................178
Identify the first empty disk pack in the target enclosure..........................178
Locate the target enclosure in the rack.....................................................179
Opening the console..................................................................................179
Removing the front bezel.......................................................................... 179
Pulling the shelf chassis out...................................................................... 180
Add new disks............................................................................................181
Close the shelf chassis.............................................................................. 182
Verify and configure the new storage........................................................182
Installing the front bezel........................................................................... 185
Chapter 4
CONTENTS
EMC Data Domain DS60 Expansion Shelf Installation and FRU Replacement Hardware Guide 5