EasyManuals Logo
Home>Honeywell>Recording Equipment>CNI2

Honeywell CNI2 User Manual

Honeywell CNI2
162 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
CNI2
O
perating and Installation
Guide
17
Assembly sequence for the backside hangers is shown in the illustration below. The lock
-
washer contacts directly with the enclosure, then the hanger, the f
lat washer, and lastly the
screw to secure. Tighten the screw until snug, but do not over
-
tighten.
Wall Mount Hangers Assembly Sequence
METER INDEX BASE
Where it is desired to have an index base mounted directly to a meter, the UMB
(
Universal
Mount
ing Bracket
)
option is available. The
a
dvantages of
this
package are that the entire
instrument can be mounted without any concerns about routing external meter pulse signal
wires. Mounting of the UMB index base is possible on rotary, turbine, and diaphr
agm gas
meters that have a rotating instrument drive output. This includes American, Rockwell, Romet,
Roots, or Schlumberger meters.
The UMB housing may be rotated about the base plate so that the instrument and index will
face in
any of the four direct
ions. R
emov
e
all four screws which attach the base plate to the
bracket housing.
Replace and tighten the four screws after you have repositioned the UMB
housing.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Honeywell CNI2 and is the answer not in the manual?

Honeywell CNI2 Specifications

General IconGeneral
BrandHoneywell
ModelCNI2
CategoryRecording Equipment
LanguageEnglish

Related product manuals