3
3.79
9924874 R02 - 2014 RZR XP / XP 4 1000 Service Manual
© Copyright 2013 Polaris Industries Inc.
14. If timing marks are not aligned, remove sprockets
and correct alignment.
15. Remove the Cylinder Holding & Camshaft Timing
Plate (PU-50563) from the end of the camshafts.
16. Rotate the engine using the flywheel and install the
remaining bolt in each camshaft sprocket. Torque the
sprocket bolts to specification.
Camshaft Sprocket Bolts:
14 ft-lb (19 Nm)
17. Rotate the engine using the flywheel and torque the
remaining sprocket bolts to specification.
18. Install the front camshaft carrier (Item 9) and two
outer retaining bolts.
19. Install the fixed cam chain guide (Item 10) and two
retaining bolts.
20. Torque the camshaft carriers bolts in sequence to
specification.
Camshaft Carrier Bolts:
7 ft-lb (10 Nm)
21. Apply Polaris PS-4 engine oil to the cam chain
tensioner bore prior to assembly. Use a new
tensioner sealing washer (Item 12).
22. Install the hydraulic cam chain tensioner (Item 11)
into the cylinder and torque to specification.
Cam Chain Tensioner:
29 ft-lb (40 Nm)
23. Rotate crankshaft through two revolutions and verify
camshaft timing is correct.
ENGINE