7
7.9
9924874 R02 - 2014 RZR XP / XP 4 1000 Service Manual
© Copyright 2013 Polaris Industries Inc.
3. Slide the front propshaft (Item 5) off the rear
propshaft (Item 6) and remove it from the vehicle.
4. Proceed to “Front Prop Shaft Installation”.
Front Prop Shaft Installation
1. Reverse the appropriate “Front Propshaft Removal”
procedure to reinstall the front propshaft.
2. Lubricate front gearcase shaft splines with Anti-
Seize.
3. Lubricate the front and rear prop shaft mid joint with
Polaris All Purpose Grease.
4. Align the front and rear prop shafts as shown below
and slide them together.
NOTE: Paint marks are applied to the front and
rear prop shafts to aid shaft alignment.
Reference these marks during installation if still
visible.
5. When installing the front prop shaft onto the front
gearcase, use a new roll pin.
6. Reposition the front gearcase and install the four
bolts that secure the front gearcase to the frame.
Torque bolts to specification.
Front Gearcase Mounting Bolts:
30 ft-lbs (41 Nm)
FINAL DRIVE