3000-Sheet Finisher (B805)
SM 1-35 G133
Installation
1.7.2 INSTALLATION PROCEDURE
This installation procedure uses the following symbols.
Unplug the main machine power cord before starting the following
procedure.
The bridge unit (B227) and optional paper feed unit (B800 or B801) must be installed
before installing this finisher.
1. Unpack the finisher and remove all tapes and packing materials from the finisher.