18 CHECK TRIP AND AUTORECLOSE CYCLE
If the auto-reclose function is being used, the circuit breaker trip and auto reclose cycle can be tested
automatically by using the application-specific settings.
To test the trip and close operation without operating the breaker, the following conditions must be satisfied:
The CB Healthy DDB signal should either not be mapped, or if it is mapped it must be asserted high.
The CB status inputs (52A, etc.) should either not be mapped, or if they are mapped they should be activated
to mimic the circuit breaker operation.
Some models can be configured for single-pole tripping. If configured for single pole tripping, either set
CT/VT RATIO > VT Connected to No, or apply appropriate voltage signals to prevent the pole dead logic from
converting to 3-pole tripping.
1. To test the first three-phase auto-reclose cycle, set COMMISSION TESTS > Test Autoreclose to Trip 3
Pole. The IED performs a trip/reclose cycle.
2. Repeat this operation to test the subsequent three-phase auto-reclose cycles.
3. Check all output relays (used for such as circuit breaker tripping and closing, or blocking other devices)
operate at the correct times during the trip/close cycle.
Check the auto-reclose cycles for single phase trip conditions one at a time by sequentially setting COMMISSION
TESTS > Test Autoreclose to Trip Pole A, Trip Pole B and Trip Pole C.
P543i/P545i Chapter 25 - Commissioning Instructions
P54x1i-TM-EN-1 685

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE P24DM and is the answer not in the manual?

GE P24DM Specifications

General IconGeneral
BrandGE
ModelP24DM
CategoryControl Unit
LanguageEnglish

Related product manuals