Figure 74: Routing and Control Board Installation
g100223
MX10008
8. To verify that the RCB is functioning normally, check the PWR LED on its faceplate and the CONTROL
BOARDS LED on the status panel. Both LEDs should light steadily shortly after the RCB is installed. If
the PWR LED is blinking yellow, there might be insufficient power available. Ensure that you have
adequate power for the additional unit.
You can also use the the show chassis environment cb command to verify that the RCB is online.
SEE ALSO
Power Requirements for MX10008 Components
MX10008 Routing and Control Board LEDs | 80
Handling and Storing MX10008 Line Cards, RCBs, and SFBs | 244
Removing and Installing MX10008 Cooling System
Components
IN THIS SECTION
Removing an MX10008 Fan Tray | 179
Installing an MX10008 Fan Tray | 183
178

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Juniper MX10008 and is the answer not in the manual?

Juniper MX10008 Specifications

General IconGeneral
BrandJuniper
ModelMX10008
CategoryNetwork Router
LanguageEnglish

Related product manuals