MX10008 Site Preparation Overview
IN THIS SECTION
MX10008 Site Preparation Checklist | 91
MX10008 Environmental Requirements and Specifications | 92
General Site Guidelines | 94
Site Electrical Wiring Guidelines | 94
MX10008 Rack Requirements | 96
MX10008 Clearance Requirements for Airflow and Hardware Maintenance | 98
MX10008 Site Preparation Checklist
The checklist in Table 27 on page 91 summarizes the tasks you need to perform when preparing a site for
an MX10008 installation.
Table 27: Site Preparation Checklist
DatePerformed ByFor More InformationItem or Task
Environment
“MX10008 Environmental
Requirements and Specifications”
on page 92
Verify that environmental factors such as
temperature and humidity do not exceed
router tolerances.
Power
Measure the distance between external
power sources and the router installation
site.
•
JNP10K-PWR-AC Power
Specifications on page 105
•
JNP10K-PWR-DC Power
Specifications on page 115
•
Power Requirements for MX10008
Components
Calculate the power consumption and
requirements.