Section 3 Manipulating Project Files 3-4 Saving Projects
NS-Designer Operation Manual
3-4 Saving Projects
The methods for saving project files are described here.
1. Select File - Save Project or click the Save Project Button in the toolbar.
New Projects
Newly created projects and screens are temporarily created in a temporary directory until saved.
The temporary directory and temporary files are as follows:
(NS-Designer install directory)\TEMP\untitled.ipp
When a project or screen is saved for the first time, the following dialog box will be displayed and the
project will be saved (copied from the TEMP directory). Specify the folder and file name where the
project will be saved, and click the Save Button.
Always observe the following precautions when specifying the project name.
The project name must be no more than 42 characters including the IPP extension. •
• Select a name using alphanumerics, underscore (_), dollar symbols ($), and periods (.).
If the project name is specified using other characters, symbols, or marks, an error will occur when the
Save Button is clicked.
3-5