EM-44
ENGINE MECHANICAL
-
Cvlinder Head
(2L-T)
INSTALL INTAKE MANIFOLD
(a)
lnstall
a
new gasket and the intake manifold with the
six bolts and two nuts.
Torque: 240
kg-cm
(17 ft-lb, 24 N-m)
HINT: Torque the three bolts on the bottom of the
manifold together with the oil level gauge guide support
and the clamp for the engine wires,
as
shown in the illustra-
tion.
(b) lnstall the insulator and nut to the glow plug resistor.
HINT: lnstall the insulator and engine wire terminals
as
shown in the illustration.
(Austria)
INSTALL
EGR
VALVE, PIPE, VALVE ADAPTOR AND
CONTROL VALVE ASSEMBLY
(a) Place a new gasket in position on the intake manifold.
(b) lnstall the EGR valve and pipe with the two nuts.
Torque:
130
kg-cm
(9
in.-lb, 13 N-m)
(c)
l
nstall the EG
R
control valve assembly with the three
bolts.
(d)
Connect the connectors to the VSV and EVRV.
(e)
lnstall two new gaskets, the EGR valve adaptor and
air pipe (LN only) with the four nuts.
Torque:
195
kg-cm
(14
ft-lb,
19 N-m)