EasyManuals Logo
Home>Triumph>Motorcycle>Daytona 955i

Triumph Daytona 955i User Manual

Triumph Daytona 955i
375 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #93 background imageLoading...
Page #93 background image
Stage
2—
all screws
15.
Invert the engine.
In the correct sequence, tighten all lower crankcase
screws to 12 Nm.
16.
Invert the engine.
In the correct sequence, tighten all upper crankcase
screws to 12 Nm.
Stage
3—
M8 screws only
17.
Invert the engine.
In the correct sequence, tighten only the M8 size
lower crankcase screws to 28 Nm.
18.
Invert the engine.
In the correct sequence, tighten only the M8 size
upper crankcase screws to 28 Nm.
19.
Rotate the crankshaft clockwise. Check for tight
spots and rectify as necessary.
6 CRANKSHAFT/RODS/PISTONS
T1IUMI
MPH
NOTE:
The crankcase screws are tightened in stages,
in the same sequences used during strip down.
Two different sizes of crankcase screw are
used. All screws are tightened through the first
two stages of the tightening procedure but only
the M8 size screws are tightened at the third
stage.
A
CAUTION: Failure to follow the correct
screw tightening sequence may result in
permanent crankcase damage.
Stage 1 — all screws
13. Invert the engine.
In the correct sequence, tighten all lower crankcase
screws to 10 Nm.
10 _
12
11
9
95
^, 2_3'x,
7 n
4' 1) 60
gagx
Lower Crankcase Bolt Tightening Sequence
14. Invert the engine.
In the correct sequence, tighten all upper crankcase
screws to 10 Nm.
6.12

Table of Contents

Other manuals for Triumph Daytona 955i

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Triumph Daytona 955i and is the answer not in the manual?

Triumph Daytona 955i Specifications

General IconGeneral
BrandTriumph
ModelDaytona 955i
CategoryMotorcycle
LanguageEnglish

Related product manuals