MAINTENANCE
7-22
Swing Bearing
--- every 250 hours
d
CAUTION: Lubricating both the swing bearing and
gear and rotating the upperstructure must be done by
one person. Before you lubricate the swing bearing,
clear the area of all persons. Lower the bucket to the
ground. Stop the engine. Pull the pilot control shut-off
lever to the LOCK position.
1. Parkthemachinefollowingthesameproceduresas
describedonpage7-6forpreparationforinspectionand
maintenance.
2. Apply grease via grease fitting (1) with a grease gun by
twotothreestrokes.
3. Starttheengine.Pushpilotcontrolshut-offlevertothe
UNLOCKposition.Raisethebucketapprox.200mm(8
in) above the ground and rotate the upperstructure 90 °
(1/4turn).
4. Lowerthebuckettotheground.
5. Repeattheprocedure(Step1to4)8times.
6. Applygreasetotheswingbearinguntilgreasecanbe
seenescapingfromtheswingbearingseals.Takecare
nottosupplyexcessivegrease.
1
MADB-07-009