MAINTENANCE
7-79
Change Bucket
--- as required
d
CAUTION: When driving the connecting pins in or
out, guard against injury from flying pieces of metal
or debris. Wear hard hat or safety glasses, and safety
equipment appropriate to the job.
Beforestartingconvertingwork,keepbystandersclearofthe
machine.Slowlymovethefrontattachment.Whenusinga
signal person, coordinate hand signals before starting.
Removal
1. Parkthemachineonalevelsurface.Lowerthebucketto
the ground and position it with the flat surface resting
ontheground.Besurethebucketwillnotrollwhenthe
pins are removed.
2. SlidetheO-ringsoutoftheway,asshown.
3. RemovebucketpinsAandBtoseparatethearmand
bucket.
Installation
1. Clean the pins and pin bores. Apply sufficient grease to
the pins and pin bores.
2. Placethenewbucketinstablepositionasshowninthe
figure.
3. Fitthearmandalternatebucket.Besurethebucketwill
notroll.InstallbucketpinsAandB.
4. InstallthelockingpinsandsnapringsonpinsAandB.
5. InstallO-ringstothespecifiedpositions.
6. Applygreasetoeachpin.
7. Starttheengineandrunatslowidle.Slowlyoperatethe
bucketinbothdirectionstocheckforanyinterferencein
bucketmovement.
M104-07-063
O-RingShift
BucketBoss
Link
A
B