FusionModule800 Smart Small Data Center
Installation Guide (Six Fans)
Copyright © Huawei Technologies Co., Ltd.
Figure 4-33 Cable route example in the bottom cable routing scenario (3 U PDU for example)
4.5.3 Connecting a PDU2000 Power Cable
Procedure
Step 1 Connect the cord end terminal on the IT cabinet output power cable routed out of the
Converged Cabinet to the PDU2000 cable port in the IT cabinet, as shown in Figure 4-34.