FusionModule800 Smart Small Data Center
Installation Guide (Six Fans)
6 Power-On Commissioning
Copyright © Huawei Technologies Co., Ltd.
233
Table 6-2 Setting generator parameters
Main Menu
Second-Level
Menu
Default Value
Setting
System
Configuration
Generator Usage
No Generator
No Generator or
Generator In Use
----End
6.2 Power-On Commissioning for the Power Supply and
Distribution System
Prerequisites
The installation has been checked.
Configure an upstream protective device that meets the overload and short-circuit protection
requirements for the Converged Cabinet. If one power input is overloaded or short-circuited,
the system can switch to the other power input automatically.
Context
Figure 6-1 shows the circuit breakers on the front panel of the Converged Cabinet.
The power distribution subrack of the Converged Cabinet can be the ATS PDU, 6 U PDU, or 3 U PDU.
This section describes the positions of circuit breakers in the Converged Cabinet when the Converged
Cabinet is configured with both the ATS PDU and 6 U PDU.

Table of Contents

Other manuals for Huawei FusionModule800

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei FusionModule800 and is the answer not in the manual?

Huawei FusionModule800 Specifications

General IconGeneral
BrandHuawei
ModelFusionModule800
CategoryStorage
LanguageEnglish

Related product manuals