FusionModule800 Smart Small Data Center
Installation Guide (Six Fans)
3 Hardware Installation
Copyright © Huawei Technologies Co., Ltd.
43
Figure 3-19 Installing an aisle side sealing plate on an end cabinet
Step 5 Install an aisle side sealing plate on the other end cabinet in the same manner.
----End
3.4 Adjusting the Positions of Cabinet Side Panels
3.4.1 Adjusting the Positions of IT Cabinet Side Panels
Prerequisites
An IT cabinet is configured.
Context
Before installing an IT cabinet, adjust the side panel position and ensure that side panel
is installed on the cabinet side towards the aisle exterior.
Install two side panels for each end cabinet, one in the upper part and the other in the
lower part.

Table of Contents

Other manuals for Huawei FusionModule800

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei FusionModule800 and is the answer not in the manual?

Huawei FusionModule800 Specifications

General IconGeneral
BrandHuawei
ModelFusionModule800
CategoryStorage
LanguageEnglish

Related product manuals