6 Power-On Commissioning
Copyright © Huawei Technologies Co., Ltd.
265
5. Click Next to complete the recording plan setting. When is displayed in the status bar,
the recording plan has been set successfully.
6. Click Finish.
Step 4 Create a user.
When connecting to the VCN on the NetEco, you need to log in to the VCN as a non-admin
user.
1. Log in to the VCN IVS as user Admin.
2. On the VCN IVS home page, double-click Add User, create a user, and click Next. The
Assign Rights page is displayed.
When creating a user, you can select Enable account validity period and set Valid from and Valid to
to set the account validity period for the created user.
Figure 6-22 Creating a user
3. Set Multi-point logins to a value greater than 2.
4. In the Assign Device View Rights area, select the cameras to be browsed and queried by
the user. Set other parameters based on the documentation delivered with the equipment
or the documentation obtained by referring to the Preparing Documentation section,
and click Finish.
----End
6.4 Power-On Commissioning for the Cooling System
6.4.1 Equipment Power-On
Prerequisites
Verify that the humidifier water inlet pipe and drainpipe are correctly connected, that the
thermal insulation foam is intact, and that refrigerant has been charged.

Table of Contents

Other manuals for Huawei FusionModule800

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei FusionModule800 and is the answer not in the manual?

Huawei FusionModule800 Specifications

General IconGeneral
BrandHuawei
ModelFusionModule800
CategoryStorage
LanguageEnglish

Related product manuals