32 Installing the PowerConnect Device
Site Requirements
The device can be mounted in a standard 19-inch rack or placed on a tabletop. Before installing the
device, verify that the location chosen for installation meets the site requirements.
â˘
General
â Ensure that the power supply is correctly installed.
â˘
Power
â The device is installed within 1.5 m (5 feet) of a grounded, easily accessible outlet 220/110
VAC, 50/60 Hz.
â˘
Clearance
â There is adequate frontal clearance for operator access. Allow clearance for cabling,
power connections and ventilation.
â˘
Cabling
â Cabling is routed to avoid sources of electrical noise such as radio transmitters, broadcast
amplifiers, power lines and fluorescent lighting fixtures.
â˘
Ambient Requirements
â The ambient unit operating temperature range is 0 to 45ÂşC (32 to 113ÂşF)
at a relative humidity of 10% to 90%, non-condensing. Verify that water or moisture cannot enter the
unit casing.
Unpacking
Package Contents
While unpacking the device, ensure that the following items are included:
⢠The device
⢠An AC power cable
⢠RS-232 crossover cable
⢠Self-adhesive rubber pads
⢠Rack mount kits for rack installation
⢠Documentation CD
Unpacking the Device
To unpack the device:
NOTE: Before unpacking the device, inspect the package and report any evidence of damage immediately.
NOTE: An ESD strap is not provided, however it is recommended to wear one for the following procedure.
1
Place the container on a clean, flat surface and cut all straps securing the container.
2
Open the container or remove the container top.
3
Carefully remove the device from the container and place it on a secure and clean surface.
4
Remove all packing material.
5
Inspect the device for damage. Report any damage immediately.