EasyManuals Logo
Home>GE>Medical Equipment>ApexPro

GE ApexPro Service Manual

GE ApexPro
198 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #155 background imageLoading...
Page #155 background image
Checkout
2001989-203C ApexProâ„¢ Telemetry 8-3
 Perform ApexPro Channelized Telemetry System receiver check. See ApexPro
Channelized Telemetry System receiver check on page 8-15.
 Perform power fail alarm verification test (power). See Power fail alarm
verification test (power) on page 8-16.
 Perform ground continuity test. See Ground continuity test on page 8-13.
 Perform ground (earth) wire leakage current tests. See Ground (earth) wire
leakage current tests on page 8-16.
 Perform enclosure (chassis) leakage current tests. See Enclosure (chassis)
leakage current test on page 8-17.
 Verify that the Remote Service agent is enabled. See Enable the Remote Service
agent on page 5-12.
Preventive maintenance checkout procedures
Use the following checklist to ensure completion of all preventive maintenance and
checkout procedures.
 Perform general visual inspection. See General inspection on page 8-7.
 Clean external surfaces. See External surfaces on page 8-9.
 Inspect power supply. See Check for power supply problems on page 6-3.
 Clean internal components. See Internal components on page 8-11.
 Clean fans. See Fans and filters on page 8-11.
 Clean filters. See Fans and filters on page 8-11.
 Perform installation check. See Perform installation check on page 5-16.
 Perform disk check. See Disk check on page 6-17.
 Perform ApexPro Channelized Telemetry System receiver check. See ApexPro
Channelized Telemetry System receiver check on page 8-15.
 Perform power fail alarm verification test (power). See Power fail alarm
verification test (power) on page 8-16.
 Perform ground continuity test. See Ground continuity test on page 8-13.
 Perform ground (earth) wire leakage current tests. See Ground (earth) wire
leakage current tests on page 8-16.
 Perform enclosure (chassis) leakage current tests. See Enclosure (chassis)
leakage current test on page 8-17.
 Verify that the Remote Service agent is enabled. See Enable the Remote Service
agent on page 5-12.
FRU replacement checkout procedures
Use the following checklist to ensure completion of all FRU replacement checkout
procedures.
 Perform general visual inspection. See General inspection on page 8-7.

Table of Contents

Other manuals for GE ApexPro

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE ApexPro and is the answer not in the manual?

GE ApexPro Specifications

General IconGeneral
BrandGE
ModelApexPro
CategoryMedical Equipment
LanguageEnglish

Related product manuals