b. Reboot the server module to which you established the serial
connection in either of these ways:
–
In the PuTTY window:
1.
Right-click in the window title bar. Then select Special
Command4Break.
2.
Enter
b
.
–
Insert the end of a paper clip into the hole for the recessed power
button in the bottom right corner of the module and then gently
press the paper clip against the power button for five seconds.
c.
Perform steps 4 through 21 of the wipe procedure on the second
server module.
23. After successfully performing the wipe procedure on both server
modules, continue with Step 9: "Shut down the S10 Node" below.
Step 9: Shut down the S10 Node
To shut down the S10 Node:
1. Using the rocker switch on each power and cooling module, power the
power and cooling modules off.
2. Disconnect the PDUpower inlet cables from the power sources.
Step 10 (conditional): Prepare the enclosure carton
If the S10 Node was returned racked, you need to prepare the enclosure
carton before you disassemble the S10 Node.
40
Chapter 3: Refurbishing an HCP S10 Node
HCP S Series Node Refurbishment
Step 9: Shut down the S10 Node