10.11 Connect the fuel pump
Periodicity
Description
Unscheduled
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 1.0 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Basic 1
Support equipment
Description Part No. CSN QTY
Flange 94569 pc 1
Flange 94569A pc 1
Roller lifting tool 94430 pc 1
Claw 94430A pc 1
Screw 94430B pc 1
Supplies
Description QTY
None
Spare Parts
Description Part No. CSN QTY
None
SAFETY PRECAUTIONS
• None
PRELIMINARY OPERATIONS
• The engine must be stopped and prepared for maintenance, refer to section 8.20 Prepare
the engine after stop - general
X92DF
AA00-5556-00AAA-730B-A
Operation Manual Connect the fuel pump
Winterthur Gas & Diesel Ltd.
- 558 - Issue 002 2020-08