D41 28
For screed charging/relieving:
- Set the drive lever (6) to the centre
position.
- Activate the screed relieving (26) or
screed charging (26) function.
- Set the pressure using pressure
regulating valve (A); read it off at
the manometer (B).
When screed charging/relieving is
necessary and automatic leveling
is used (grade control and/or slope
control), the compacting performance
changes (layer thickness).
The pressure can also be set or corrected during paving (Max. 50 bar).
Setting pressure for screed control with paving stop + relieving
- Set the drive lever (6) to the centre position.
- Switch off the "floating position" (23) (Toggle switch up).