C11 8
4
Transportation
Reduce the paver finisher and the screed to their basic widths; also remove any
attached side plates.
4.1 Preparations
- Prepare the paver finisher for transportation (see chapter D).
- Remove all overlaying or loose parts from finisher and screed (see also Operating
instructions for the screed). Store these parts in a safe place.
When the screed is operated with the optional gas heating system:
- Remove the gas bottles for the screed heating system:
- Close main shut-off valves and bottle valves.
- Turn off the valves on the bottles and remove the gas bottles from the screed.
- Transport the gas bottles on a second vehicle; heed all applicable safety
regulations.