E11 36
7. Screed
The Operating instructions for the screed cover all work required for mounting,
setting up and extending the screed.
8. Electrical connections
Establish the following connections when the mechanical assemblies have been
mounted and set up:
- Connect the auger limit switches to the remote control (2).
- Connect the remote control (2) and external levelling system (1) to cable
connectors on both sides of the main screed.
Always seal unused sockets with the relevant protective caps!