DIRECTION 5854713-100, REVISION 2
VENUE FIT™ SERVICE MANUAL
Chapter 3 - System Setup 3-19
PRELIMINARY
To connect a probe:
1) Hold the probe connector horizontally with the cable pointing Left.
2.) Prior to inserting the probe, ensure that the connector locking handle is positioned down.
3) Align the connector with the probe port and carefully push into place.
4) Push the connector locking handle upwards to secure the probe connector.
5) Carefully position the probe cord so it is free to move and is not resting on the floor.
3-5-5-3 Disconnect Probes
Follow these steps to disconnect the RS probes, as applicable:
1) Move the connector locking lever downwards to unlock the connector.
2) Carefully remove the connector from the port.
3) Ensure that the probe head is clean before placing the probe in its storage case.
For cleaning instructions, see the User Manual.
3-5-6 Power on/Boot up
For procedure, see: Power ON/Boot-up .
3-5-7 Power Shut Down
For procedure, see: Power Shutdown .
3-5-8 Complete Power Down
For procedure, see: Complete Power Down .