3.4 Overview
3.4.1 Overview of the system
A EV
B Parking space
C Front of the EVSE
D EVSE
E AC input cable
F Power distribution board
G EV charge cable
Part Function
EV The EV of which the batteries need to be charged
EVSE Refer to section 3.4.2.
Parking space Location for the EV during the charge session
AC input cable To supply the electrical energy to the EVSE
Power distribution board To connect the EVSE to the AC grid input
EV charge cable To conduct the charge from the EVSE to the EV
Description
30 9AKK108467A6398-EN | 002