Procedure
1. Do a check on the transport sensors.
2. Remove the packaging material. To discard the packaging material, refer to
section 2.12.
3. Make sure that all parts are delivered according to the order. Refer to the order
and section 10.3.
4. If you find damage or the parts are not according to the order, contact the local
representative of the manufacturer.
4.2.2 Do a check of the transport sensors
Preliminary requirements
Installation engineer
Procedure
1. Do a check on the sensors (A) that
record the shocks during transport.
2. Do a check on the sensors (B)
that record the maximum tilt during
transport.
3. If the sensors (A) show a red
indication or the sensors (B) show a
tilt that is too high, do these steps:
For the transport specifications, refer
to section 10.4.
a. Refuse the delivery of the EVSE.
b. Make a note on the delivery
receipt.
c. Within three days of the delivery,
ask the transport company for an inspection.
d. If you see damage on the cabinet, through the packaging material, do not
unpack the EVSE.
e. Contact the manufacturer and give details of the delivery problems.
TiltWatch PLUS
TiltWatch PLUS
ShockDot
WARNING
ShockDot
WARNING
A
B
Transport, handling and unpacking
56 9AKK108467A6398-EN | 002

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB Terra 360 CE and is the answer not in the manual?

ABB Terra 360 CE Specifications

General IconGeneral
BrandABB
ModelTerra 360 CE
CategoryBattery Charger
LanguageEnglish

Related product manuals