EasyManuals Logo
Home>Mercury>Outboard Motor>90

Mercury 90 Service Manual

Mercury 90
574 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #551 background imageLoading...
Page #551 background image
90-830234R3 DECEMBER 1997 ATTACHMENTS/CONTROL LINKAGE - 7B-7
Tiller Arm/Shift Lever
Removal
1. Remove battery cables from battery.
2. Remove outboard cowling.
3. Remove nuts securing shift link rod and throttle
cable to engine. Release latch and remove shift
link rod and throttle cable from anchor bracket.
a
b
c
d
e
f
51620
a - Locking Nut
b - Washer
c - Shift Cable
d - Throttle Cable
e - Latch
f - Anchor Bracket
4. Remove cotter key, washer, bushing and shift link
rod from shift lever.
a
b
c
d
51624
a - Cotter Key
b - Washer
c - Bushing
d - Shift Link Rod
5. Remove access cover from underneath tiller
handle bracket.
a
b
51626
a - Access Cover
b - Screws
6. Disconnect key switch, lanyard stop switch and
tiller stop switch leads at bullet connectors.
Remove screw securing key switch and tiller stop
switch ground leads.
a
b
51626
a - Bullet Connectors
b - Screw

Table of Contents

Other manuals for Mercury 90

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mercury 90 and is the answer not in the manual?

Mercury 90 Specifications

General IconGeneral
BrandMercury
Model90
CategoryOutboard Motor
LanguageEnglish

Related product manuals