Chapter 12 Installing, Removing, and Replacing
Cabling the Library
Scalar i500 User’s Guide 297
Cabling Libraries With
SCSI Tape Drives 12
Use this procedure, along with Figure 40 and Figure 41, if you are
installing a library that includes SCSI tape drives:
Warning: All libraries taller than 14U must be installed in a rack
having a main protective earthing (grounding) terminal,
and power must be supplied via an industrial plug and
socket-outlet and/or an appliance coupler complying with
IEC 60309 (or an equivalent national standard) and having
a protective earth (ground) conductor with a cross
sectional area of at least 1.5 mm
2
(14 AWG).
To ensure proper airflow and access space, Allow 60 cm
(24 inches) in the front and back of the library.