EasyManuals Logo
Home>Suzuki>Motorcycle>RM-Z250

Suzuki RM-Z250 Service Manual

Suzuki RM-Z250
411 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #131 background imageLoading...
Page #131 background image
CLUTCH 7-3
CLUTCH PLATE
REMOVAL
• Drain engine oil. (2-13)
• Remove the brake pedal. (17-20)
• Remove the clutch cover 1 and its gasket 2.
• Remove the clutch spring set bolts 3 and clutch springs.
NOTE:
Loosen the clutch spring set bolts 3 little by little and diagonally.
• Remove the clutch pressure plate 4, washer 5 bearing 6
and push piece 7.
• Remove the push rod 8.
NOTE:
If it is difficult to pull out the push rod 8, use a magnetic hand or
a wire.

Table of Contents

Other manuals for Suzuki RM-Z250

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Suzuki RM-Z250 and is the answer not in the manual?

Suzuki RM-Z250 Specifications

General IconGeneral
BrandSuzuki
ModelRM-Z250
CategoryMotorcycle
LanguageEnglish

Related product manuals