EasyManuals Logo
Home>Suzuki>Motorcycle>RM-Z250

Suzuki RM-Z250 Service Manual

Suzuki RM-Z250
411 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #318 background imageLoading...
Page #318 background image
17-16 FRONT AND REAR BRAKES
FRONT MASTER CYLINDER REASSEMBLY
AND INSTALLATION
Reassemble and install the master cylinder in the reverse order
of removal and disassembly. Pay attention to the following
points:
Install the brake lever. (17-19)
NOTE:
When remounting the master cylinder onto the handlebar, align
the master cylinder holder’s mating surface A with the matching
mark B on the handlebar and tighten the lower bolt 1 first.
Tighten the master cylinder holder bolts (1, 2) to the speci-
fied torque.
Master cylinder holder bolt :
(Lower
1
): 12 N·m (1.2 kgf-m, 8.5 lbf-ft)
(Upper
2
): 10 N·m (1.0 kgf-m, 7.0 lbf-ft)
NOTE:
Fast tighten the bolt of master cylinder holder bolt lower side C,
due to hot starter lever 3 provided.
a Clearance
4 Master cylinder
5 Master cylinder holder
Set the brake hose end between the hose stopper D, then
tighten the brake hose union bolt 6 to the specified torque.
Brake hose union bolt: 23 N·m (2.3 kgf-m, 16.5 lbf-ft)
Refill brake fluid and bleed air from the brake system.
(17-4)
Replace the seal washers with new ones.

Table of Contents

Other manuals for Suzuki RM-Z250

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Suzuki RM-Z250 and is the answer not in the manual?

Suzuki RM-Z250 Specifications

General IconGeneral
BrandSuzuki
ModelRM-Z250
CategoryMotorcycle
LanguageEnglish

Related product manuals