EasyManuals Logo
Home>Suzuki>Motorcycle>RM-Z250

Suzuki RM-Z250 Service Manual

Suzuki RM-Z250
411 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #153 background imageLoading...
Page #153 background image
GEARSHIFTING 9-5
INSPECTION
Inspect the gearshift shaft 1 for bends and damage.
Inspect the return spring 2 for damage.
If necessary, replace the defective parts with a new one.
Inspect the pawls 3, pins 4, springs 5, gearshift roller 6
and gearshift cam driven gear 7 for damage.
If necessary, replace the defective parts with a new one.
INSTALLATION
Install the gearshift in the reverse order of removal. Pay atten-
tion to the following points:
Install the washer 1 and gearshift arm stopper 2.
Apply a small quantity of THREAD LOCK SUPER to the gear-
shift arm stopper 2 and tighten it to the specified torque.
99000-32030: THREAD LOCK SUPER “1303”
or equivalent
Gearshift arm stopper: 23 N·m (2.3 kgf-m, 16.5 lbf-ft)
Install the washer 3, spring 4 and gearshift cam stopper 5.
Tighten the shift cam stopper bolt 6 to the specified torque.
Shift cam stopper bolt: 10 N·m (1.0 kgf-m, 7.0 lbf-ft)

Table of Contents

Other manuals for Suzuki RM-Z250

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Suzuki RM-Z250 and is the answer not in the manual?

Suzuki RM-Z250 Specifications

General IconGeneral
BrandSuzuki
ModelRM-Z250
CategoryMotorcycle
LanguageEnglish

Related product manuals