EasyManuals Logo
Home>Suzuki>Motorcycle>RM-Z250

Suzuki RM-Z250 Service Manual

Suzuki RM-Z250
411 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #364 background imageLoading...
Page #364 background image
REAR SUSPENSION 19-15
INSPECTION
PIVOT SHAFT
Measure the pivot shaft runout with the dial gauge and V
blocks.
If any the runout exceeds the limit, replace the pivot shaft with
a new one.
Swingarm pivot shaft runout
Service Limit: 0.3 mm (0.01 in)
09900-20607: Dial gauge
09900-20701: Dial gauge chuck
09900-21304: V blocks
CHAIN BUFFER AND CHAIN GUIDE
Inspect the chain buffer 1 and chain guide 2 for damage
and excessive wear.
If any defects are found, replace the chain buffer or guide with
a new one.
PLATE
Inspect the plate for damage and excessive bend.
If any defects are found, replace the plate with a new one.
SWINGARM
Inspect the swingarm for cracks and damage.
If any defects are found, replace the swingarm with a new
one.

Table of Contents

Other manuals for Suzuki RM-Z250

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Suzuki RM-Z250 and is the answer not in the manual?

Suzuki RM-Z250 Specifications

General IconGeneral
BrandSuzuki
ModelRM-Z250
CategoryMotorcycle
LanguageEnglish

Related product manuals