EasyManuals Logo
Home>Suzuki>Motorcycle>RM-Z250

Suzuki RM-Z250 Service Manual

Suzuki RM-Z250
411 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #275 background imageLoading...
Page #275 background image
ELECTRICAL SYSTEM 15-3
SEMI-CONDUCTOR EQUIPPED PART
Be careful not to drop the part with a semi-conductor built in
such as a ECM.
When inspecting this part, follow inspection instruction strictly.
Neglecting proper procedure may cause damage to this part.
CONNECTING THE BATTERY
WHEN USING THE BATTERY LEAD WIRE (Optional part:
36890-28H00)
When disconnecting terminals from the battery for servicing,
be sure to disconnect the - battery lead wire, first.
When connecting the battery lead wires, be sure to connect
the + battery lead wire, first.
WIRING PROCEDURE
Properly route the wire harness according to the “WIRING
HARENESS ROUTING” section. (20-18 to -20)
INCORRECT

Table of Contents

Other manuals for Suzuki RM-Z250

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Suzuki RM-Z250 and is the answer not in the manual?

Suzuki RM-Z250 Specifications

General IconGeneral
BrandSuzuki
ModelRM-Z250
CategoryMotorcycle
LanguageEnglish

Related product manuals