EasyManuals Logo
Home>Suzuki>Motorcycle>RM-Z250

Suzuki RM-Z250 Service Manual

Suzuki RM-Z250
411 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #39 background imageLoading...
Page #39 background image
PERIODIC MAINTENANCE 2-23
HOT STARTER
Adjust the hot starter cable play as follows:
NOTE:
Be careful not to damage the lever cover when installing.
(20-28)
Loosen the lock-nut 1.
Turn adjuster 2 so the hot starter lever clearance A mea-
sured at the lever holder obtains 2 – 3 mm (0.08 – 0.12 in)
when squeezing the lever until pressure is felt.
Tighten the lock-nut 1.
Hot starter lever clearance A: 2 – 3 mm (0.08 – 0.12 in)
Cable adjuster lock-nut: 2.2 N·m (0.22 kgf-m, 1.60 lbf-ft)
Check that the hot starter lever moves smoothly from full open
to full close.
If it does not move smoothly, lubricate the hot starter cable.
THROTTLE BODY
Inspect the throttle body for dirt or mud. If any dirt or mud is
found, clean the throttle body.

Table of Contents

Other manuals for Suzuki RM-Z250

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Suzuki RM-Z250 and is the answer not in the manual?

Suzuki RM-Z250 Specifications

General IconGeneral
BrandSuzuki
ModelRM-Z250
CategoryMotorcycle
LanguageEnglish

Related product manuals