59
CAUTION: Before performing any service actions on this equipment as described in this chapter,
please keep in mind that all the safety guidelines, safety instructions, warnings and cautions
mentioned in the Safety manual should be adhered to.
After performing service actions on this equipment, the projector will perform a self-test to check for
its own optical integrity (all lasers should follow the correct optical path in the system). After that is
completed, make sure to perform an optical alignment. Do this to ensure maximum light output. For
more info on the optical alignment, please refer to “Optical alignment”, page 147
Overview
•
Overview
• Removing the Light Source
• Removal of the Controller assembly
• Replacing the Laser Control Board (LCB)
• Replacing the Peltier Controller
• Replacing the 24V Filter board
• Mounting of the Controller assembly
• Installing the Light Source
• Replacing the Phosphor Wheel Interconnection Board
• Replacing the Phosphor Wheel Monitoring Interconnection Board
• Replacing the Light Source Fan Interconnection Board
• Replacing the Light Sensor Interconnection Board
• Replacing the Blue Laser Interconnection Board
• Replacing a fan from the Light Source
• Replacing the combiner of the Light Source
• Replacing the phosphor wheel
• Replacement of the Anode Fan
• Replacement of the Cathode Fan
• Replacement of the Cold Mirror fan
R5906848 /04 DP2K SLP Series
Laser Phosphor
Light Source
7