EasyManuals Logo

Komatsu PC130-7 User Manual

Komatsu PC130-7
330 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #150 background imageLoading...
Page #150 background image
MACHINE OPERATIONS AND CONTROLS OPERATION
3-84
MACHINE OPERATION 3
Preparations for Moving the Machine Off 3
WARNING
q Before operating the steering levers, check the direc-
tion of the track frame.
If the sprocket is at the front, the operation of the travel
levers is reversed.
q When moving off, check that the area around the
machine is safe, and sound the horn before moving.
q Do not allow anyone in the area around the machine.
q Remove all obstacles from the travel path of the
machine.
q The rear of the machine is a blind spot, so be particu-
larly careful when travel in reverse.
q If the lever is moved inside the deceleration range,
engine speed will rise suddenly. Operate the levers
carefully.
q For machines equipped with a travel alarm , check that
the warning equipment works properly.
1. Set swing lock switch (1) to the ON (actuated) position and
confirm that swing lock monitor lamp (2) lights up.
2. Turn fuel control dial (3) towards the full speed position to
increase the engine speed.
A
ON
MAX

Table of Contents

Other manuals for Komatsu PC130-7

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Komatsu PC130-7 and is the answer not in the manual?

Komatsu PC130-7 Specifications

General IconGeneral
BrandKomatsu
ModelPC130-7
CategoryExcavators
LanguageEnglish

Related product manuals